The PMI ACP Practice Exam is the secret ingredient that guarantees an error-free outcome and enhances the experience. The PMI ACP Practice Exam is a wonderful tool for evaluating your performance in terms of the number of questions you can answer and your ability to maintain a healthy level of stress during the final exam. Additionally, it supports you in planning for a buffer, which acts as a safety net for you throughout the PMI ACP Certification exam. Today, give it a try!

Further Reading:

Are You Prepared? | Professional PMI-ACP Practice Exams and Questions

2021 Updated PMI-ACP Practice Test 1

2021 Updated PMI-ACP Practice Test 2

Question #11

Agile project development processes typically:

A. Encapsulate analysis, design, code, and test within an iteration.
B. Document each business process individually and in detail.
C. Use a Gantt chart with well-defined activities, responsibilities, and time frames.
D. Map the iteration backlog to a Work Breakdown Structure (WBS).

Correct Answer: A

Question #12

Which of the following would be most likely to assist when a customer has difficulty prioritizing stories?

A. Split the stories into smaller ones to allow the customer to choose the pieces that they want.
B. Have the team provide guidance into where their priorities lie to the customer.
C. Provide additional technical details to give the customer insight into technical challenges.
D. Have the team rewrite the stories with additional details to clarify requirements.

Correct Answer: A

Question #13

When interacting with team members, the Agile project manager should:

A. Ask team members to do things by phrasing the statement as a request rather than as a demand.
B. Ignore team member input and emotions when important decisions have to be made.
C. Proceed cautiously when requesting team members to do something likely to make them unhappy.
D. Disagree with the team based on the merit of the issue without considering how the team is feeling.

Correct Answer: A

get 100% pass dumps

Question #14

Which best describes the attributes of the IN VEST criteria in a user story?

A. Incremental, Net, Variation, Exceed, Scope, and Training
B. Interdependent, Nonfunctional, Value, Exploratory, Sprint, and Timebox
C. Innovation, Nested, Vision, Estimating, Scalable, and Team
D. Independent, Negotiable, Valuable, Estimable, Small, and Testable

Correct Answer: D

Question #15

A user story says that a product must be very fast. During the demo, the Product Owner is dissatisfied with the speed of the product. The most likely reason that this occurred is because the user story was:

A. Too large.
B. Not estimated correctly.
C. Not testable.
D. Not descriptive of the value.

Correct Answer: D

Question #16

Team A is producing 61 points per iteration and Team B is producing 20 points per iteration. Team A has more senior engineers. A manager demands that Team B match Team A’s points in the next iteration. Based on this information, it is reasonable to tell the manager that:

A. it is impossible to compare two separate teams on points alone.
B. Team B’s points will match Team A if Team B gets more senior engineers.
C. Team B must have help self-organizing so their points match Team A.
D. Team B’s points will increase if the Product Owner becomes more involved.

Correct Answer: A

Question #17

Which of the following is a list of valid Agile project planning practices?

A. Release planning, Iteration planning, and Estimation
B. Estimation, Spike Solutions, and Iteration planning
C. Iteration planning, Continuous Integration, and Estimation
D. Vision, Release planning, and Performance Optimization

Correct Answer: A

Question #18

Who is responsible for prioritizing the stories that will be included in the iteration?

A. ScrumMaster
B. Developer
C. Product Owner
D. Team

Correct Answer: C

Question #19

On a project using eXtreme Programming (XP), a customer test is a:

A. Technique to determine if the software is easy for customer use.
B. Tool for a customer to verify the business requirements.
C. Technique to determine if a customer will use a software feature.
D. Test for determining if a customer will purchase the product.

Correct Answer: B

Question #20

What is the best description of the relationship between Scrum and extremeProgramming(XP)?

A. XP is a component of Scrum.
B. The principles of each are often complementary.
C. Scrum is a component of XP.
D. The principles of each are often contradictory.

Correct Answer: B

Conclusion

As a result, if you’ve studied with the SPOTO PMI ACP Practice Exam, passing the PMI ACP Certification exam will be a breeze! Prepare to effortlessly navigate the PMI ACP Certification path with SPOTO’s 100% Real PMI ACP Exam Dumps and arrive at your PMI ACP destination!

get 100% pass dumps

Latest SPOTO Candidates Pass Feedback

Last modified: 2021-11-26

Author

Comments

Write a Reply or Comment

Your email address will not be published.