SPOTO updates the latest Newest Cisco CCNP 300-625  DCSAN certified exam demos that cover all real exam answers and questions. We have helped thousands of candidates pass the exam in the first try. SPOTO can guarantee you can pass the exam and provide 7/24 technical support.

CategoriesExam Code100% Pass Dumps
CCNP Data Center350-601 DCCOR
300-610 DCID
300-615 DCIT
300-620 DCACI
300-625 DCSAN
300-635 DCAUTO
350-601 DCCOR

Benefits of Choosing SPOTO CCNP Exam Dumps

  • 100% Passing Rate
  • Timely Updated Exam Dumps
  • Completely Coverage of Real Exam
  • Real Simulated Exam Environment
  • 24h Professional Tutors Instruction
  • High-score Passing Guarantee
  • Latest Passing Report Feedback
  • Professional Service Team

Get SPOTO 100% Real  CCNP Exam Answers and Questions!

The following is the Newest Cisco CCNP CCNP 300-625  DCSAN exam demos:

QUESTION 1
Which two steps are mutual between Cisco secure boot and UEFI secure boot? (Choose two.)

A. bootloader
B. operating system
C. micro loader
D. kemel
E. hardware anchor
Correct Answer: AB

QUESTION 2
Which feature on MDS platforms ensures that the code that is running on the hardware platform is authentic

and unmodified, while also validating the BIOS to eliminate any rootkits.
A. Cisco Secure Boot
B. UEFI Secure Boot
C. Secure Unique Device Identifier
D. BIOS Secure Boot
Correct Answer: A

QUESTION 3
Which component is initially responsible for loading the kickstart image on Cisco MDS Switches?

A. ROMMON
B. BIOS
C. NX-OS
D. BASH
Correct Answer: C

QUESTION 4
A network engineer must run a core Cisco Nexus 9500 Series Switch as a POAP server for all top-of-rack Cisco Nexus switches. Which two network functions must run to provide the POAP service? (Choose two.)

A. DNS
B. PXE
C. BOOTP
D. TFTP
E. DHCP
Correct Answer: DE

QUESTION 5
Which two components are required for successful MDS USB POAP? (Choose two.)

A. NTFS formatted USB drive
B. USB drive in port 1
C. script named poap_script pl
D. ENTERPRISE_PKG license
E. system and kickstart images
Correct Answer: CE

QUESTION 6
A Cisco MDS Series Switch with the POAP feature boots and does not find the startup configuration. Which location is checked first when the switch enters POAP mode?

A. USB device that contains the software image files and the switch configuration file
B. DHCP server to bootstrap the interface IP address, gateway, DNS server, and TFTP IP addresses
C. TFTP server where the necessary configuration files are downloaded
D. HTTP server where the URL is used to download the software image
Correct Answer: A

QUESTION 7
After user account attributes are modified in Cisco NX-OS when doing changes to the user’s session attributes take effect?

A. immediately
B. at the scheduled time
C. when the user logs out of a session
D. when the user creates a new session
Correct Answer: D

QUESTION 8
Which Cisco NX-OS command displays the VSAN that is associated with each FCID?

A. show fcdomain
B. show fc2 plogi
C. show vsan database
D. show flogi database
Correct Answer: A

QUESTION 9
Which configuration is available only in Cisco DCNM-SAN Advanced mode?

A. IVR
B. VMpath configuration
C. zoning
D. template-based provisioning
Correct Answer: A

QUESTION 10
A storage network engineer is implementing disk-array data replication between two SAN environments in two different data centers not connected via Fibre Channel. Which SAN switch feature must be implemented?

A. FCIP
B. zoning merge over LAN
C. VSAN scoping
D. IVR
Correct Answer: A

Note: if you have finished testing the exam demos, and you want to get a detailed explanation. And you can contact us to get them. Join SPOTO to Pass your exam in the first try! 

 

Latest SPOTO Candidates Pass Feedback 

 

Last modified: 2021-01-05

Author

Comments